BOMs, job costs, and multi-step production routed through one ledger. Margin is a live figure on every work order, not a spreadsheet you rebuild after the fact.
Manufacturing pain points cluster around costing and traceability. These are the ones we hear most.
Multi-level bills of materials with routings. Material, labor, and overhead post to WIP at the moment a work order moves, using current cost, not standard.
Each work order shows budget, actual, and variance as it runs. The finance team sees the same number the floor sees.
Tax holidays, special rates, and the required reporting treated as a first-class regime, not a footnote glued onto a global chart.
PH compliance is in active development. This is the manufacturing-specific surface we are building toward.